•Drifts (not very exciting)
–All drifts in both sections remained near the minimum length (0.5m), apart from:
–Decay channel D2 which is 0.55m, possibly for matching
–Phase rotation drifts PD1, PD2 which are 0.834m and 0.618m
–PD1 includes last chicane drift
–RF cavities are within these “drifts”